Close Menu
Invest Intellect
    Facebook X (Twitter) Instagram
    Invest Intellect
    Facebook X (Twitter) Instagram Pinterest
    • Home
    • Commodities
    • Cryptocurrency
    • Fintech
    • Investments
    • Precious Metal
    • Property
    • Stock Market
    Invest Intellect
    Home»Stock Market»Utilities contracts: Be prepared | Comment
    Stock Market

    Utilities contracts: Be prepared | Comment

    April 1, 20164 Mins Read


    Stella Mitchell and Katherine Calder and Katy Wall

    Monday 18 April will see the extension to utilities and concession contracts of the principles that have applied to public bodies since April 2015 under the Public Contracts Regulations 2015. The Utilities Contracts Regulations 2006 will be replaced by the Utilities Contracts Regulations 2016, transposing the Utilities Directive 2014/25/EU into law in England, Wales and Scotland. These changes have been introduced to codify case law, simplify procedures, provide additional flexibility and facilitate the market participation of SMEs and start-ups.

    So what will this mean for utilities? The key message is that pre-procurement preparation will become obligatory and no longer just best practice. Rushing into a procurement exercise without thorough preparatory work on key issues could be commercially disadvantageous and will also now put a utility at risk of challenge. Some important points to consider:

    • Procurement documents must be available online from the date of publication of the relevant contract notice. This is the date of publication of the OJEU notice or, where a qualification system is used instead of an OJEU notice as the call for competition, the date of the invitation to tender or negotiate. The definition of “procurement documents” is broad, covering commercial, legal and technical requirements. This suggests a need for utilities to undergo a productive period of market consultation before issuing of a contract notice. There is debate as to whether this requirement to make documentation available only applies where the relevant document already exists (rather than operating as an obligation to produce it) or whether it constitutes an obligation actually to produce all of the documents with the contract notice. On the latter interpretation, how complete do the documents need to be? There has been conflicting advice, but the assumption should be that all procurement documents do need to be provided
      – not necessarily in final form
      – particularly where the competitive dialogue or competitive procedure with negotiation is used.
    • Framework agreements have long been a way for utilities to avoid numerous procurements on the same subject matter but the new regulations place an eight-year term limit on the use of framework agreements by utilities. Moreover, the evaluation criteria both for awarding entry onto a framework and also for the placing of orders under it must now be set out in the procurement documents and the framework agreement itself. While direct awards are allowed as well as mini-competitions, the applicable criteria to determine how a direct award is to be made must also be provided from the outset. This is a huge departure for many utilities which are used to setting the criteria for mini-competitions at the time of call-off and reserving complete discretion when choosing to make direct awards.
    • Utilities now have explicit discretion to apply a “lotting strategy” (for example, limiting suppliers to one lot or maintaining the flexibility to award multiple lots to the same supplier). This strategy will need to be set out clearly in the procurement documents and so must be considered at the outset.
    • Variations to existing contracts will require a new procurement where that variation is “substantial”. In line with existing case law, a modification will be considered to be substantial where it renders the contract materially different in character from the one initially concluded. A modification with a value below the procurement threshold or which is contemplated in some way in the contract will not require a new procurement. Where a variation is valued at less than 15% of contract value for works contracts or less than 10% of contract value for services or supply contracts, it is similarly exempt from the requirement to carry out a new competition. Utilities will therefore need to consider at the start of a procurement exercise whether the intended contract is flexible enough to accommodate potential future requirements.

    The same issues require early engagement from a supplier perspective. Bidders responding to contract notices should be aware of the additional obligations on their prospective employers to provide procurement documents at an earlier stage and need to be ready to respond within the shorter timescales which the new regime allows utilities to set. Bidders should benefit from increased early transparency when preparing tender responses. The controls introduced to limit the term of framework agreements should also provide opportunities to new contractors rather than allowing utilities to extend previously procured contracts.

    The changes imposed on utilities by way of the new regulations will result in a significant front-ending of the workload for procuring entities. How many utilities will be prepared for the change?

    Stella Mitchell is a partner, Katherine Calder is a consultant and Katy Wall is a senior associate at Berwin Leighton Paisner LLP



    Source link

    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email

    Related Posts

    Stock Market Today LIVE: Sensex jumps over 300 points, Nifty 50 above 25,550; PSU banks, metals rally; IT stocks drag

    Stock Market

    1:5 Stock Split + Dividend Stocks Today: IRCTC, SJVN, PFC, Senco Gold, Info Edge Trending; 25+ Stocks Ex-Date On Friday, February 20

    Stock Market

    These dividend stocks can insulate investors from AI risk, says Jenny Harrington

    Stock Market

    Utilities are growth stocks despite creaking infrastructure

    Stock Market

    3 Dividend Growth ETFs to Buy With $500 and Hold Forever

    Stock Market

    Sensex crashes 1,236 points, investors lose ₹7 lakh crore— Why did the stock market fall? Explained with 5 key factors

    Stock Market
    Leave A Reply Cancel Reply

    Top Picks
    Precious Metal

    Visionary Copper and Gold targets growing its near-surface critical and precious metals rich deposit in Newfoundland – BNN Bloomberg

    Precious Metal

    Helen Flanagan Stuns in Shimmering Gold Corset

    Precious Metal

    Cours Certificat CALL – SPRINTER OPEN END – SILVER

    Editors Picks

    Des scientifiques créent des feuilles de métaux de quelques atomes d’épaisseur seulement

    March 18, 2025

    The Most Topical Issue in Fintech Today

    October 30, 2025

    3 magnificent FTSE 250 stocks to consider for growth and dividends

    September 21, 2025

    Best Cryptos to Invest in This Bullrun/Coins That Have Potential of 1000x

    July 20, 2024
    What's Hot

    Commodity Roundup: Gold faces weekly loss after positive jobs data, oil set for ~4% gain

    August 9, 2024

    Hillsdale FFA Agricultural Soils team places 6th in state

    October 29, 2024

    Télécharger WinZip System Utilities Suite (gratuit) Windows

    January 16, 2025
    Our Picks

    Better Cryptocurrency to Buy Right Now With $5,000: XRP vs. Ethereum

    June 22, 2025

    Report: Saudi Arabia’s fintech evolution – digital payments, inclusion and Vision 2030

    December 16, 2025

    Cylinder Blast in Karnataka Leaves 2 Critically Injured; Metal Items Found at Spot | Bengaluru News

    September 29, 2025
    Weekly Top

    Chinese green energy tycoon warns AI boom will strain global power

    February 19, 2026

    1:5 Stock Split + Dividend Stocks Today: IRCTC, SJVN, PFC, Senco Gold, Info Edge Trending; 25+ Stocks Ex-Date On Friday, February 20

    February 19, 2026

    PB Fintech Shares Rise After Kotak Upgrades Rating Citing Strong Growth and Improved Risk Reward for Policybazaar Parent

    February 19, 2026
    Editor's Pick

    Veolia et Waga Energy ont inauguré une unité de production de biométhane en Saône-et-Loire

    June 19, 2025

    Hideo Kojima says “no one ever told me” Konami turned down a Matrix game – but maybe there “could’ve been a way to make it work” despite Metal Gear Solid 2

    October 29, 2025

    Cross River govt boosts mechanised agricultural practice, distributes tractors to farmers

    October 13, 2025
    © 2026 Invest Intellect
    • Contact us
    • Privacy Policy
    • Terms and Conditions

    Type above and press Enter to search. Press Esc to cancel.