Close Menu
Invest Intellect
    Facebook X (Twitter) Instagram
    Invest Intellect
    Facebook X (Twitter) Instagram Pinterest
    • Home
    • Commodities
    • Cryptocurrency
    • Fintech
    • Investments
    • Precious Metal
    • Property
    • Stock Market
    Invest Intellect
    Home»Precious Metal»Edge Copper Mobilizes Drill Rigs and Commences 53,000 Foot Drilling Program at Zonia
    Precious Metal

    Edge Copper Mobilizes Drill Rigs and Commences 53,000 Foot Drilling Program at Zonia

    January 22, 20263 Mins Read


    VANCOUVER, BC, Jan. 22, 2026 /CNW/ – Edge Copper Corporation (TSXV: EDCU) (“Edge Copper” or the “Company“) today announces that drilling has commenced on its 100%-owned Zonia Copper Project (“Zonia”), located in Arizona. Two diamond drill rigs have been mobilized on site, initiating a six-month drill program.

    “The commencement of this drill program represents an important step in advancing Zonia toward the next stage of development,” said Gil Clausen, Chair and CEO of Edge Copper. “By optimizing the drill plan and integrating advanced data analytics through our collaboration with GeologicAI, we are able to efficiently upgrade and expand the resource while supporting future mine planning. The results from this program and the updated mineral resource are expected to establish the foundation for the size and development potential of Zonia. As a first step, we expect to announce a Preliminary Economic Assessment next month on the Zonia Project, which will represent an initial development milestone and provide a framework upon which the Company intends to advance the project.”

    GeologicAI’s Resource Exploration Strategies (RXS), Edge Copper’s technical collaborator and manager of the exploration program, has completed a drill spacing and optimization study for Zonia, which has improved program and capital efficiency, while maximizing value and maintaining the program’s technical objective. As a result, the original planned drilling has been reduced from approximately 60,000 feet to approximately 53,000 feet for a total of 78 holes.

    Approximately 65% of the drill holes planned will focus on the conversion of Zonia’s oxide copper Indicated and Inferred Mineral Resources to higher confidence categories. Approximately 24% of the holes will be for step-out and expansionary drilling and the remaining 14% will be for condemnation and geotechnical drilling. A drill hole location map is provided in Appendix A.

    The Company has also mobilized GeologicAI’s proprietary core scanner, which will be used to digitize historical core and scan newly drilled core in real time, with remote geological logging. This approach is expected to enhance data quality, enable near-real-time evaluation of results, and allow the Company to dynamically adjust drill targeting as the program progresses.

    Edge Copper expects to report drill results over the next seven to eight months, subject to assay laboratory turnaround times. Based on the results of this drill program, the Company expects to update the Zonia mineral resource in late Q3 or early Q4 2026. Successful execution of the program could support an expanded mineral resource and contribute to a larger-scale and longer-life operation at Zonia.

    About Edge Copper Corporation

    Edge Copper Corporation is a copper-focused exploration and development company advancing its 100%-owned Zonia Copper Project in Arizona. Zonia is a past-producing SX-EW heap leach operation on private land, located in Arizona’s historic Walnut Grove mining district. With existing infrastructure and significant potential for resource expansion, Zonia is well-positioned to become a key U.S. copper development project. For more information, please visit www.edgecopper.com.

    The TSX Venture Exchange has in no way passed upon the merits of the Transaction or the Concurrent Financing and has neither approved nor disapproved the contents of this news release. Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

    Appendix A: Drill Hole Location Map (CNW Group/Edge Copper Corporation)



    Source link

    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email

    Related Posts

    Silver (XAG) Forecast: Can Silver Market Sustain Parabolic Surge Over $100 or Is Correction Coming?

    Precious Metal

    Silver rally drives nationwide surge in investment product demand

    Precious Metal

    State-Run Hindustan Copper Emerges Preferred Bidder For Baghwari-Khirkhori Copper Block In Madhya Pradesh

    Precious Metal

    Why Heavy Copper PCBs Are Non-Negotiable for High-Power Systems

    Precious Metal

    Gold, silver rates today: Metal prices continue to rise. Should you buy them before the Union Budget 2026?

    Precious Metal

    PRECIOUS METALS RALLY FUELS INVESTOR INTEREST IN KUWAIT

    Precious Metal
    Leave A Reply Cancel Reply

    Top Picks
    Investments

    Bank, NBFC investments in AIFs may get smoother

    Commodities

    Norway’s Oil Fund to Buy Stake in German Electricity Transmission System Operator for $5.3 Billion — Commodities Roundup

    Property

    Yamaichi Real Estate Co., Ltd : Performances sectorielles

    Editors Picks

    Generali Investments dévoile son premier fonds de crédit privé secondaire avec Partners Group

    April 22, 2025

    Dhanteras 2025: A guide to investing in gold, silver and precious metals ETFs

    October 17, 2025

    Who knew heavy metal pyjamas were a thing? Well, now I do and I’m picking up a pair for winter in the huge Hot Topic sale

    November 30, 2025

    Taux : vague de ‘risk-off’, seuls les T-Bonds US en profitent – 10/03/2025

    March 10, 2025
    What's Hot

    Job opening marks new era in agriculture: Operators for autonomous tractors fleets

    August 14, 2024

    MCX silver likely to hit `3.2L mark in 2026

    January 12, 2026

    Waga Energy, Petit Poucet du gaz renouvelable devenu grand

    April 7, 2025
    Our Picks

    Reeves plans £2bn Budget raid on UK retirement savings

    November 7, 2025

    Why Dawgz AI is the One to Watch

    February 18, 2025

    Weaker iron ore prices hit Rio Tinto earnings

    February 19, 2025
    Weekly Top

    Why Heavy Copper PCBs Are Non-Negotiable for High-Power Systems

    January 25, 2026

    55-64 Year Olds Retirement Savings Analysis Reveals Surprises About Their Financial Readiness

    January 25, 2026

    Gold, silver rates today: Metal prices continue to rise. Should you buy them before the Union Budget 2026?

    January 25, 2026
    Editor's Pick

    Banks May Provide Cryptocurrency Transaction and Custody Services, but OCC Has Yet to Provide Clear Compliance Requirements | McGuireWoods LLP

    May 12, 2025

    Commercial real estate, Boeing layoffs: Asking for a Trend

    October 11, 2024

    A New Digital Rival: How CBDCs May Disrupt High Fees and Power Concentration in Payments

    November 18, 2025
    © 2026 Invest Intellect
    • Contact us
    • Privacy Policy
    • Terms and Conditions

    Type above and press Enter to search. Press Esc to cancel.